Wall Panel Installation Instructions

Measure walls step 2.
Wall panel installation instructions. General purpose construction adhesive step 1. Dupont tyvek drainvent rainscreen. Secure each standoff to its appropriate stud fixing pin which is attached to the wall. Your walls must be leveled as much as possible.
Top and bottom wall interface methods 1 2. Place panels in the room where they will be installed. Install all panels by maintaining the identical orientation of the sticker and thus of the. Install the top cap step 6.
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level. It may also be used to alert against unsafe practices. Let them sit 24 hours for above grade and 48 hours for below grade installations. Install the corner moulding and panel step 5.
Cut any fixture openings step 4. Set the panel in place over the standoff bases and attach the standoff head cap trims to secure the panel. Place panels flatly on their length of 2 438 m 8 feet against the wall in way to allow air circulation between panels. Trim frp panels to fit step 3.
Gently remove any crown moulding baseboards and trim you plan on using again. Installation instructions 1 2 1 sheets. Never install panels over damp walls or an existing mold condition. Lay along 8 edge and stack out from the wall using shims as spacers between the panels.
Check panels for color matching and quality before applying. Indicates a potentially hazardous situation which if not avoided may result in injury. For best results set the paneling in the room for a few days before you install it. Use proper installation methods follow all instructions related to wall surface preparation.
Air barrier installation details. Failure to follow such. This exposes all four sides to the air. Installation of dupont tyvek wrb for wall panel construction.